The fronts are at the sleeve decreases:
so with the back and the sleeve cuffs done I think I'm about 60% done. Sleeves always take MUCH longer than I thought, but the sleeves on this one will be knit up from the cuffs, which are fairly long, so I only have about 3/4 of each sleeve to do. Maybe not by the end of the month, but maybe at least the two fronts done by then? That's possible...................I think............
No comments:
Post a Comment